Our Skyline Box range of glazing bars offer an economical roof glazing solution when compared with curtain walling roofing systems. The glazing bar's strength is provided by an internal box section. The glazing bar is weathered by a screw on pressure cap (PC1) with a choice of plain (PC2) or ornate (PC3) cosmetic outer snap-on cappings to conceal all fixing screws.



When used with high performance double glazing units with warm edge spacer bars and argon gas filling this system can achieve an overall U Value of 1.4W/ m²K to comply with Building Regulation Document L.


Our Skyline range of glazing bars offer an economical roof glazing solution incorporating slim sightlines. The glazing bar's strength is provided by an internal stalk (or fin) which is cut away at the top and bottom main fixing positions.
An internal snap-on ornate capping system (PC4) is also available if desired to fully conceal the internal stalk giving the appearance of a feature timber rafter.



When used with high performance double glazing units with warm edge spacer bars and argon gas filling this system can achieve an overall U Value of 1.4W/ m²K to comply with Building Regulation Document L.


Timber rafters (supplied by the builder or joinery sub-contractor) will create an appealing visual effect inside any home and are totally protected from the effects of weathering by our externally clad Rafterline Patent Glazing system.
Due to the pleasing aesthetics of aluminium and timber materials our Rafterline system is the most popular specifiers choice for domestic projects.



When used with double glazing and thermal breaks this system is easily capable of providing an overall U Value of 1.6W/ m²K to comply with Building Regulation Document L.


Our Traditional patent glazing system remains our customers most popular choice for use on unheated spaces such as Railway Stations, glazed canopies and covered ways where thermal properties are not a consideration.
This system has been installed on thousands of projects nationwide and is available with a choice of capping systems to suit your needs.
A truly great glazing system combined with economy and a proven track record. 30,000m² of this glazing system has been installed by us on many major railway stations throughout the UK in recent times.



This system is capable of accommodating solid or multi-wall polycarbonate sheets or double glazed units up to 28mm thick if used on unheated spaces or where compliance with Building Regulations Document L are not a consideration.


Our 'Heritage' Patent Glazing Bar range is truly unique amongst roof glazing systems; there are no alternative products available on the market which can match an original lead covered steel patent glazing bar which originates from the Victorian era. This range has been manufactured by us unaltered for over a century and is the perfect product for listed buildings and for use in the refurbishment of significant and historic buildings. This system is also still very popular for new build projects and should not to be overlooked on today's modern buildings where a unique character look is desired.

 


Periodic cleaning of the glazing to remove dirt and the build up of debris will be required to keep the glazing system in a good order and to avoid the loss of light transmission from the glass. Certain glass products can be subjected to thermal stresses if the panes are left unclean for prolonged periods of time.
Aluminium sections with powder coated or anodised finishes must also be cleaned regularly to conform to the terms of guarantee.

 

 
  • Introduction
         

CLEANING AND MAINTENANCE
Under the Construction (Design and Management) Regulations 2007, the Designers of the building have a responsibility to design-in access, at the initial and early design stages, for the cleaning and maintenance requirements of the completed project.
Maintenance Managers and Operatives must refer back and consult the "Health and Safety File" and an appropriate Method Statement/Risk Assessment for guidance on access, routes for foot traffic, safety requirements and the use of all necessary Personal Protection Equipment, prior to any work being carried out